Tooting · SW17

Bathroom Layout Transformation

A bathroom in Tooting completely redesigned in three weeks. We removed the wall dividing the room to open up the space, then replanned the layout with every fixture in a new position, renewing the plumbing, water supplies and waste connections throughout to suit. A new dropped ceiling carries recessed lighting, the wet areas were waterproofed before tiling, and new sanitaryware, ventilation and electrics finish a room that is more spacious and practical than the one it replaced.

More about our bathroom renovations →
Area
Tooting · SW17
Duration
Three weeks
Work
Bathroom renovation

The transformation

Before & after

Drag the slider to reveal the transformation.

Bathroom Layout Transformation after
After
Bathroom Layout Transformation beforeBefore
Bathroom Layout Transformation · Tooting · SW17

How it was done

The full transformation, stage by stage

Every photo below is from this job, in the order the work happened. Tap any one to see it full size.

  1. Stage 1: The old layout

    The customer wanted the bathroom redesigned into a more spacious, practical and modern room. That meant removing the wall dividing it, moving the bathroom fixtures and renewing the plumbing throughout.

    The old bath and small basin beneath the window
    The toilet in a narrow compartment of its own
    The old shower over the bath, with a mosaic tile border
  2. Stage 2: Strip-out and replumbing

    The bathroom was stripped out and the dividing wall removed to open up the space. With the room open, the new fixture positions were planned for comfortable circulation, and the water supplies, waste routes and drainage were altered for the new toilet, basin and bathing area.

    Walls stripped back to the old tile adhesive
    New supply pipes run across the exposed timbers
    Timber stud framing with new pipework, before boarding
  3. Stage 3: The finished bathroom

    A new dropped ceiling with recessed lighting, the wet areas prepared and waterproofed, then wall and floor tiling, new sanitaryware and fittings, and upgraded electrics and ventilation. Painting, decorating, testing and snagging finished the job.

    The finished room from the doorway, walk-in shower beside the window
    Walk-in shower with a glass screen and rainfall head
    The toilet beneath the shuttered window, with a heated towel rail
    Basin on a wood-effect vanity unit, with a mirror above

The part you don't see

Replanning the room from scratch

The main challenge was removing the dividing wall and reorganising the entire layout within the existing space. Once the room was opened up, every fixture position had to be planned for comfortable circulation and practical everyday use. The plumbing and drainage needed extensive alterations for the new positions of the toilet, basin and bathing area, and the new waste routes, water supplies, dropped ceiling, lighting and ventilation all had to be coordinated before waterproofing, tiling and final installation could begin.

What went in

  • Removal of the internal dividing wall
  • Complete bathroom layout transformation
  • Full plumbing and drainage alterations
  • New dropped ceiling with recessed lighting
  • Waterproofed wet areas
  • New sanitaryware and fittings
  • Wall and floor tiling

★ 5.0 · 30+ five-star reviews

Planning a bathroom renovation?

Book a free, no-obligation site visit and we'll show you what's possible in your home.

Book a Free Site Visit

Free visit · No obligation · We call ahead