Chiswick

Full House Renovation

A whole house in Chiswick taken back to its structure and rebuilt over ten months, from the first strip-out to the final coat of paint. We replaced the roof, built a new extension and converted the loft, then reworked the internal layout around the way the family actually lives. New plumbing, heating and a complete electrical installation went in alongside underfloor heating, insulation, plastering and bespoke joinery, with a new kitchen and a fully refurbished bathroom. Keeping the house weatherproof and structurally protected while the roof, extension and loft were all open at once was the real work, and it is why the finished property reads as one considered home rather than a series of additions.

More about our full home renovations →
Area
Chiswick
Duration
Ten months
Work
Full house renovation

How it was done

The full transformation, stage by stage

Every photo below is from this job, in the order the work happened. Tap any one to see it full size.

  1. Stage 1: The brief

    The customer wanted the whole property renovated and modernised into a high-quality family home: a better internal layout, more living space from an extension and a loft conversion, a new roof, and the kitchen, bathroom, heating, plumbing, electrics and finishes all replaced.

  2. Stage 2: Roof, structure and loft

    After the strip-out and structural alterations, the roof was replaced in full while the extension and loft conversion were built, with the house kept weatherproof and structurally protected throughout.

    The new roof: breather membrane and battens over the hip
    Steel frame and new rafters going up at dusk
    Loft floor joists going in above the party wall
  3. Stage 3: Insulation, services and plaster

    New insulation, complete plumbing and heating, underfloor heating and a full electrical installation went in before the walls and ceilings were boarded and plastered.

    Insulation fitted between the new rafters
    A room plastered out under the new rooflight
  4. Stage 4: The finished home

    New kitchen, fully refurbished bathroom, internal doors, bespoke joinery, flooring throughout, painting and decorating inside and out, then testing, snagging and clearance. The finished property reads as one considered home rather than a series of additions.

    The finished front elevation and entrance
    The entrance hall with herringbone flooring
    The hallway, herringbone floor running through
    The staircase with slatted timber panelling
    The converted loft, with its rooflight
    The garden: decking, paving and lawn
    The living room in ochre, with the timber floor left exposed
    The lounge: painted panelling and an open fireplace

The part you don't see

Everything open at once

Roof replacement, extension, loft conversion, bathroom, structural alterations and a complete services upgrade all ran inside one programme. The property had to stay structurally protected and weatherproof while large areas were open and being rebuilt. Kitchen, bathroom, underfloor heating, plumbing and electrics were coordinated with the new layouts and floor build-ups, and the trades were sequenced across ten months so that structure, roofing, first fix, waterproofing, plastering, joinery, tiling and finishes each landed in the right order.

What went in

  • Full roof replacement
  • New extension
  • Loft conversion
  • Whole-house underfloor heating
  • Complete plumbing, heating and electrical upgrade
  • New kitchen and refurbished bathroom
  • Bespoke carpentry and joinery
  • Structural alterations and improved layout

★ 5.0 · 30+ five-star reviews

Planning a bigger renovation?

Book a free, no-obligation site visit and we'll show you what's possible in your home.

Book a Free Site Visit

Free visit · No obligation · We call ahead